We are making slow but steady progress on the guest shed and I have to keep reminding myself that. We. Are. Making. Progress.

Mr. Math, in true Mr. M fashion wants to do as much as he absolutely can on his own. He removed the foam insulation panels, the acoustic tiles, the hardboard wall panels, a ton of wasp nests, roach poop, and the cabinet with a sink in it. The man has had days where he limped from spending the day on a ladder but he didn’t quit. He is such a hard worker. After contacting several contractors- two never showed up- and another was backed up with Texas freeze work, we did hire someone to put the new roof on and had it scheduled to begin this past Monday. Sunday was stressful. We dodged rain and high winds to get the corrugated metal roofing off and our great neighbor helped get the last of the heavy furniture out and tarped the building.

Monday came, the sky was clear, and the weather was perfect to work on the building. The builders didn’t show. They didn’t answer texts or calls. It was radio silence. I cried a bit. Finally in the evening we got a text saying they went out of town and were very sorry but would be there first thing in the morning. First thing in the morning meant they arrived at 2:06 p.m. By that time the weather was changing with rain expected so Mr. Math didn’t want the tarp removed only to have to put it up again in an hour or so. The lumber got dropped off and that was that.

Wednesday …well Wednesday it rained followed by near gale force winds. Here the building sits. So frustrating because had it been started on time it would be totally dried in and we wouldn’t be worried about the rains.

I have to remind myself that we have made progress on the project. The front wall has been reworked, the door frame resized and moved, the wall over the area that will be the kitchenette resized and a new window installed, the window space cut in the bathroom wall, the bathroom has been framed up and covered with a house wrap. Mr. Math also got all rotted wood replaced and has everything firmed up. I can’t wait for the tarps to be off to show you the front wall.

We did take a shopping trip to pick out metal roof color, windows which was ordered and picked up Wednesday morning before the rain came, we also picked up 2 pocket door kits, an exterior door kit, and I found a 24 inch vintage door on marketplace for the closet. I have cleaned the antique kitchen cupboard, and removed the loose paint. As soon as it is dryer I will get it outside so it can be safely sanded (lead paint) then get it all painted.

I have also got three coats of Spar varnish on the front door. I am keeping it dry in the greenhouse. I love this door. I still need to do some work on it but it is going to be so pretty when it is in place.

As I work on my attitude about things I can’t control, I have to add that I channeled some of my frustration into painting the master bathroom which was the last room in the house that was the peachy-beige. I don’t love the almond colored counter and shower but I am going to make it work. I do plan on stripping the paint off the vanity and staining it weathered oak. The wall color is called historic gray. It is a green-gray that goes with the yellow tones well.

We have so much to be grateful for and I guess I needed a few days to work on my attitude.

This morning the sun is up and we are hopeful.

We love hearing from you.

Blessings,

Karen

2 responses to “Progress (Sort of)”

  1. I look forward to seeing more of your progress!

Leave a Reply

Trending

Discover more from The Weekend Country Girl

Subscribe now to keep reading and get access to the full archive.

Continue reading